http://whois.kisa.or.kr/openapi/ipascc.jsp?query=18.222.120.133&key=2021011510473053261236&answer=json select * from g5_language where lang_code2 = 'us' 터보맥스

터보맥스

본문 바로가기
Product Application
Field Application
Case Studies
Carbon Neutrality
Case Studies
Carbon Neutrality

Field Application

수처리
Water

· Aeration in wastewater treatment systems

제철 공정
Steel Mill

· Furnace combustion

· Metal Refining

발전소 연소
Power Plant

· Flue Gas

· Circulating Fluidized Bed Combustion

석유화학 & 정제
Petrochemical & Refining

· Sulfur Recovery Unit

기타 산업 공정
Industrial

· Air Knife system

· Fermentation

· Pneumatic Conveyor System

· Drying

Impressive Return of Investment Period

* The break-even point may vary depending on the applied model.

·Up to 40% of power cost can be saved and typical return on investment period is 2-3 years.
The longer turbo blower is used, the more savings can be realized.

Dark Mode
  • Privacy Policy
  • Email Terms
  • Terms of Use

Headquarters : 208, Osongsaengmyeong 9-ro, Osong-eup, Heungdeok-gu, Cheongju-si, Chungcheongbuk-do, Republic of Korea    

Hyeondo Factory : 12-21, Jugamdowon-ro, Hyeondo-myeon, Seowon-gu, Cheongju-si, Chungcheongbuk-do, Republic of Korea    
TEㅣ : +8243-275-6002, FAX : +8243-275-6004

Copyright © 2021 by TurboMAX Co.Ltd., All Right Reserved.